Mexico YMCA

Luebbert Engineering worked with City of Mexico staff to develop a stormwater management plan for an expansion of the Mexico YMCA.

This included the design and modeling of multiple detention and bioretention areas as well as piping network.
Design criteria included the need to maximize an area for use as a youth soccer field.

Mexico YMCA before picture 2      Mexico YMCA before picture 3